Morning Observation

On the morning of 22 September 2026, both LAN Card status lights were observed to be green.

This was after they had been displaying Green and Orange for a couple of months; they were observed as both green this morning.

This is recorded as a factual observation only. No conclusion is being made regarding the cause of the change.

The service indicators remain relevant to the ongoing incident record because they had previously shown a different condition. The timing of this change may therefore be useful when compared with Metro Fibre’s technical records and any work performed on the service.

Customer-Side Network Testing

After returning home from work, I performed a customer-side network test at approximately 14:54–14:57 SAST on 22 September 2026.

The test included the local router, Cloudflare, Google, a 100-packet MTR test, and DNS queries through the router, Cloudflare DNS, and Google DNS.

Local Router — 192.168.1.254

The local connection to the router was therefore responding consistently during this test.

Cloudflare — 1.1.1.1

Google — 8.8.8.8

MTR — Google 8.8.8.8

A 100-packet MTR test was performed.

The recorded route showed:

The MTR therefore recorded 0% packet loss across all reported hops and at the destination during this test.

DNS Testing

DNS resolution was successful through all three tested DNS paths:

Technical Record

The customer-side test performed on the afternoon of 22 September 2026 recorded:

These results document the condition of the connection at the time of testing. They do not establish the cause of the earlier service problems or the reason for the change in indicator-light status.

The results are being added to the existing technical evidence record so that the sequence of events and customer-side observations remain documented accurately.


Prepared for: Metro Fibre Technical Support
Status: Customer-side testing completed and recorded.
Test period: Approximately 14:54–14:57 SAST, 22 September 2026.
Result: Connectivity and DNS tests completed successfully with 0% packet loss in the recorded tests.

↩ Return to the article I came from

Previous: PlebWare Site Progress — Another Day at the Conference Table.

Next: When Trials and Tribulations Keep You in the Fire.

No earlier PlebWare article yet

You haven't viewed any other PlebWare articles in this tab yet. If you arrived from Google or opened this article directly, there may be no earlier PlebWare article to return to.

You can keep exploring from here: